Welcome to BigLedger Knowledge Center!
Issues and Plans
2.3 Issues
Issues: main
When the user switches to the tab Issues, this issue listing will be shown up. All the issues will be listed down here.
2.3.1 Create
Issues: Create
The user can click the “+” button to create a new issue.
Issues: Create Table
There are two tabs on the “Add Issue” page, Details and Planning to be filled.
Fields in the Details tab that need to be filled:
Issue Title
Issue Key
Issue Number
Priority
Critical
Major
Minor
Trivial
Blocker
Blank
Project
Issue Type
Assignee
Reporter
Company
Branch
Store
Profit Center
Segment
Dimension
Contact
Description
Summary
Fields in Details tab that are needed to be filled:
Target Start Date
Target End Date
Actual Start Date
Actual End Date
Calculated Start Date
Calculated End Date
Baseline Start Date
Baseline End Date
Billing Currency
Billing Amount
Cost Currency
Cost Amount
Story Point
Manday Target
Manday Actual
Manday Allocation
Manday Billing
After filling in all the required details, the user needs to click the “Create” button which is on the top right corner to create the new issue.
2.3.1.1 Details
Issues: Details tab
On this page, the user needs to provide the needed information about the issue, the issue title, issue key, issue number, priority, issue status, project, issue type, assignee, reporter, company, branch, store, profit center, segment, dimension, contact, description, and summary.
2.3.1.1 Planning
Issues: The planning tab
On this tab, the user needs to add needed information about the issue planning, Target Start Date, Target End Date, Actual Start Date, Actual End Date, Calculated Start Date, Calculated End Date, Baseline Start Date, Baseline End Date, Billing Currency, Billing Amount, Cost Currency, Cost Amount, Story Point, Manday Target, Manday Actual, Manday Allocation, and Manday Billing.
2.3.2 Edit
Issues: Edit
Users can open the edit page of the specific issue by clicking on it.
Issues: Edit table
There are multiple tabs on the “EDIT Issue” page, Details, Planning, Attachment, Comment, Subtasks, Linked Issues, Worklog, and Activity.
After the user finishes the change, do not forget to click “Save” which is on the top right corner to save the changes.
2.3.2.1 Details
Issues: Edit Details Tab
On this tab, the user can edit information about the issue details, the issue title, issue key, issue number, priority, issue status, project, issue type, assignee, reporter, company, branch, store, profit center, segment, dimension, contact, description, and summary.
2.3.2.2 Planning
Issues: Edit Planning Tab
On this tab, the user can edit information about the issue planning, Target Start Date, Target End Date, Actual Start Date, Actual End Date, Calculated Start Date, Calculated End Date, Baseline Start Date, Baseline End Date, Billing Currency, Billing Amount, Cost Currency, Cost Amount, Story Point, Manday Target, Manday Actual, Manday Allocation, and Manday Billing.
2.3.2.3 Attachment
Issues: Edit Attachment Tab
On this tab, the user can add attachments to the issue by clicking on the + Sign on the left of the tab. Moreover, the user can search for attachments by the file name.
2.3.2.3.1 Add
Issues: Edit Attachment Add Tab
On add attachment tab, you can add an attachment to the issue by choosing from your files, or clicking and dropping to the attachment.
2.3.2.3.1 Edit
Issues: Edit Attachment Edit Tab
You can click on the record of the attachment you want to edit the attachment, and choose another file.
2.3.2.4 Comment
Issues: Edit Comment Tab
On the Comment tab, you can see the comments on the issue. You can search for a specific comment by the comment description. You can create new comments by clicking on the + button.
2.3.2.4.1 Add
Issues: Edit Comment Add Tab
You can add a description and attachment to the comment and then click
ADD COMMENT.
2.3.2.4.1 Edit
Issues: Edit Comment Edit Tab
You can click on an issue comment row to edit the comment by changing the description and attachment, or delete the comment.
2.3.2.5 Subtasks
Issues: Subtasks Tab
On the subtasks tab, you can see the subtasks related to the issue. You can search for a subtask by subtask title and date created. You can create, or add a subtask to the issue by clicking on the + button.
2.3.2.5.1 Add
Issues: Subtasks Add Tab
On the subtasks add tab, you can select subtasks to add then press the Add Subtask button, or you can search for specific subtasks by subtask title or date created. You can add new subtasks by clicking on the
button.
Issues: Subtasks Add Tab
On subtasks add subtasks, you can add a new subtask by entering the issue title, issue number, project, issue type, and description.
2.3.2.6 Linked Issues
Issues: Linked Issues Tab
On the linked issues tab, you can see the linked issues related to the issue. You can search for a linked issue by the linked issue title and date created. You can create, or add a linked issue to the issue by clicking on the + button.
2.3.2.6.1 Add
Issues: linked issues Add Tab
On linked issues add linked issues, you can add new linked issue(s) and add a description to the linked issues.
2.3.2.7 Worklog
Issues: Worklog Tab
On the worklog tab, you can log what you do and how much you spend doing it. You can search for a worklog by the worklog description. You can create, or add a worklog to the issue by clicking on the + button.
2.3.2.7.1 Add
Issues: Worklog Add Tab
On the worklog add linked issues, you can log a new worklog by adding the log date, duration, and description.
2.3.2.7.2 Edit
Issues: Worklog Edit Tab
You can click on a worklog row to edit the worklog. You can edit the date, duration, and description. You can also delete a worklog.
2.3.2.8 Activity
Issues: ActivityTab
The Activity tab is used to show all the changes to the current issue. You can search for specific activities by the action and event code.
2.4 Plans
The user can create new plans on this page, the user can keep adding more details to their plan until they finally want to convert the plan to the project.
Powered by: Bigledger Sdn Bhd