Welcome to BigLedger Knowledge Center!
5.0 Line Items
This is the second menu of the applet, here are the listing of the line items with the information alongside with BOPIS GIN No, Item Code, Item Name, Ordered Qty, Unit Price, SST/VAT/GST, Txn Amount, Creation Date and Requested Delivery Date.
5.1 Item Details
5.1.1 Main Details
This is the first subtab of the Item Details, this tab shows the information about that item. In this subtab, there are a lot of information are presented which are Item Code, Item Name, Quantity Base, Qty by UOM, UOM to Base Ratio, Unit Price by UOM, Unit Discount by UOM, Unit Price, Unit Discount, Discount Amount, STD Amount(Unit Price x Quantity), Net Amount(STD Amount - Discount Amount), SST Code, SST/GST/VAT, Tax Amount, Net Amount(SST/GST/VAT x Net Amount), WHT Code, WHT, WHT Amount, Txn Amount and Remarks.
5.1.2 Delivery Instruction
This subtab provides the information to the supplier with specific instructions regarding the delivery of the line item. There are two sections in this subtab, the first section is Delivery Instructions which include Instructions and Delivery Date. The second section is Delivery Message Card which include From, To and Message.
5.1.3 Department
Users can view the Segment, G/L Dimensions, Profit Center, and Project that are connected to the purchase order under this Department tab.
5.1.4 Related Documents
This sub-tab shows the documents related to these particular items. There are some information to view such as Doc No, Branch, Server Doc Type, Status and Date.
5.1.5 Delivery Details
Under this tab, users can see the details about the delivery in Require Delivery, Delivery Status, Delivery Region Code, Delivery Region Status, Delivery Logic, Delivery ID, Planned Delivery Date, Estimate Delivery Date, Actual Delivery Date, Delivery PIC Name, Delivery PIC Contact, Requested Delivery Date and Delivery Remarks.
5.1.6 Delivery Trips
Under this tab, there is information about the trip that is related to this particular items. Trip No, Driver Name, Vehicle No, Job Start Date, Job End Date, Delivery Status, Recipient Name and Qty are also showing for further details.
5.2 Costing Details
This tab shows costing details information for line items such as Company Code, Location Code, Qty, Moving Average Unit Cost, FIFO Unit Cost, Manual Unit Cost and Last Purchase Unit Cost.
5.3 Pricing Details
This tab shows the pricing scheme related to line items with the various information such as Pricing Scheme Code Pricing Scheme Name, Unit Price and Modified Date.
5.4 Issue Link
Users can view a list of issues that are linked to a line item using the Issue Link tab. Each linked issue can also show the logged time, if any, that was used to work on it. The list of issues contain this information such as Project, Issue Number, Issue Summary, Issue Description, Assignee, Created Date, Resolved Date and Status.
5.4.1 Edit Issue
When the user clicks on the issue, the additional information is shown on this tab. In this tab, users can see Issue Number and Summary as main information and below, Details tab, Project, Issue Type, Assignee, Reporter, Summary, Description, Parent and Created Date.
5.4.2 Planning
In the Planning tab, user can see more information about the issue such as Target Start Date, Target End Date, Actual Start Date, Actual End Date, Calculated Start Date, Calculated End Date, Baseline Start Date, Baseline End Date, Billing Currency, Billing Amount, Cost Currency, Cost Amount, Story Point, Manday Target, Manday Actual, Manday Allocated and Manday Billing.
5.4.3 Attachment
In this tab, users can upload any related or important information that is needed for the issue. Just click the Upload File button and the user can choose any type of file to upload.
5.4.4 Comment
This is the comment tab, anyone can put their comment about the issue. After putting the comment, the user can see the Date, User and finally Comment in this section.
5.4.5 Subtasks
Sometimes one issue can have many subtasks like bug fixing or enhancement, this tab shows every subtask related to this issue. User can see Issue Type, Issue Number, Summary, Description, Assignee, Priority, Due Date and Status of the subtasks.
5.4.6 Linked Issues
Sometime issues are made of two part such as frontend and backend, if a issue is a frontend issue then in this Linked Issues tab, users can see the linked backend issues with their details such as Project, Issue Type, Issue Number, Summary, Description, Assignee, Due Date and Status.
5.4.7 Worklogs
This is the tab where the issue is kept track by the assignee with the details such as Date, Name, Time Spent and Description.
5.4.8 Activity
This tab is like a history of the issue starting from the creation of the issue to the end of the issue, some information visible to the user are Date, User and Activities.
Powered by: Bigledger Sdn Bhd